State estimated standard "Reference book of basic prices for design work in the construction of "Railways"


Before sending an electronic application to the Ministry of Construction of Russia, please read the rules of operation of this interactive service set out below.

1. Electronic applications in the field of competence of the Ministry of Construction of Russia filled in in accordance with the attached form are accepted for consideration.

2. An electronic appeal may contain a statement, complaint, proposal or request.

3. Electronic appeals sent through the official Internet portal of the Ministry of Construction of Russia are submitted for consideration to the department for working with citizens' appeals. The Ministry provides an objective, comprehensive and timely consideration of applications. Consideration of electronic appeals is free of charge.

4. In accordance with the Federal Law of May 2, 2006 N 59-FZ "On the procedure for considering applications from citizens of the Russian Federation", electronic applications are registered within three days and sent, depending on the content, to the structural divisions of the Ministry. The appeal is considered within 30 days from the date of registration. An electronic appeal containing issues, the solution of which is not within the competence of the Ministry of Construction of Russia, is sent within seven days from the date of registration to the appropriate body or the appropriate official, whose competence includes resolving the issues raised in the appeal, with notification of this to the citizen who sent the appeal.

5. An electronic appeal is not considered when:
- the absence of the name and surname of the applicant;
- indication of an incomplete or inaccurate postal address;
- the presence of obscene or offensive expressions in the text;
- the presence in the text of a threat to the life, health and property of an official, as well as members of his family;
- using a non-Cyrillic keyboard layout or only capital letters when typing;
- the absence of punctuation marks in the text, the presence of incomprehensible abbreviations;
- the presence in the text of a question to which the applicant has already received a written answer on the merits in connection with previously sent appeals.

6. The response to the applicant of the appeal is sent to the postal address specified when filling out the form.

7. When considering an appeal, it is not allowed to disclose the information contained in the appeal, as well as information relating to the private life of a citizen, without his consent. Information about the personal data of applicants is stored and processed in compliance with the requirements of Russian legislation on personal data.

8. Appeals received through the site are summarized and submitted to the leadership of the Ministry for information. The answers to the most frequently asked questions are periodically published in the sections "for residents" and "for specialists"

Prices provided by "Railways" ed. 2014 take into account all the requirements for the development of project documentation established by the design standards as of 01/01/2014.

Base prices for the design of station buildings, contained in table 7 "Railways" ed. 2014, the cost of designing anti-icing systems for roofs and gutters is not taken into account and can be additionally determined in accordance with paragraph 2.1.4 of section II of the Guidelines for the use of Reference books of basic prices for design work in construction for costing (form 3P).This provision fully applies to clause 6 "Wagon, truck scales" of Table No. 9 "Cargo facilities" of the specified Directory.At the same time, the need for the reconstruction of access railway tracks is determined by the standards for the design of this facility, and their cost can be calculated additionally.

In accordance with clause 2.6.1. Chapters 2.6 “Railroad crossings” (table No. 50) “Railways”, ed. 2014 base prices do not include the cost of designing a crossing booth. To table No. 50, tables of relative cost for the construction of industrial facilities No. 53-54 should be applied.

If it is required to install noise barriers on certain sections of the road (if the specified work is provided for by the design assignment), the cost of the specified design work is determined in addition to the cost of designing the road.

According to clause 8.1 "Storage and utility rooms, up to 100 m2", clause 13.1 "Access road to buildings with a length of up to 1 km" of Table No. 10 "Individual buildings and structures" in the column "unit of measurement of the main indicator of the object" instead of " m2" and "km" should read "object". In paragraph 11.1 of Table No. 10 of the Directory "Railways" of the 2014 edition. in the column "unit of measurement of the main indicator" should read "object" instead of "lm".

The fencing of these objects can be determined in the manner prescribed by paragraph 9 of Table No. 10 "Individual buildings and structures" of the CBC "Railways", ed. 2014, regardless of the material of the building envelope. Considering clause 11 "Retaining and enclosing walls in the ground" of Table No. 10 "Individual buildings and structures" "Railways" ed. 2014 refers to linear facilities.

At the same time, in accordance with clause 1.8 of the Guidelines for the use of reference books of basic prices for design work in construction, approved by the Ministry of Regional Development of the Russian Federation by order No. 620 dated December 29, 2009 and registered by the Ministry of Justice of the Russian Federation No. 16686 dated March 23, 2010, the recommended indicators of the relative cost of developing sections of design and working documentation presented in the CBC, if necessary, can be clarified by the design organization when designing a specific facility within the total cost, depending on the complexity of the work performed.To determine the indicators of the relative cost of developing design and working documentation for the design of specific facilities within the total cost of developing design products, it is possible to use indicators of the relative cost of sections given in the tables of the relative cost of developing design and working documentation for the construction of facilities contained in the invalid due to the release SBC “Railways and highways. Bridges. Tunnels. Subways. Industrial Transport” edition of 1995. At the same time, the reduction coefficients for the absence of such sections as “Architectural solutions”, “Gas supply”, “Water supply”, “Water disposal” and others established by the SBC, in calculating the cost of design work for the construction of railways, do not apply.

Editor's Choice
Bonnie Parker and Clyde Barrow were famous American robbers active during the...

4.3 / 5 ( 30 votes ) Of all the existing signs of the zodiac, the most mysterious is Cancer. If a guy is passionate, then he changes ...

A childhood memory - the song *White Roses* and the super-popular group *Tender May*, which blew up the post-Soviet stage and collected ...

No one wants to grow old and see ugly wrinkles on their face, indicating that age is inexorably increasing, ...
A Russian prison is not the most rosy place, where strict local rules and the provisions of the criminal code apply. But not...
Live a century, learn a century Live a century, learn a century - completely the phrase of the Roman philosopher and statesman Lucius Annaeus Seneca (4 BC -...
I present to you the TOP 15 female bodybuilders Brooke Holladay, a blonde with blue eyes, was also involved in dancing and ...
A cat is a real member of the family, so it must have a name. How to choose nicknames from cartoons for cats, what names are the most ...
For most of us, childhood is still associated with the heroes of these cartoons ... Only here is the insidious censorship and the imagination of translators ...